PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing top metal track at the 2nd Floor Facing North (800x600).jpg Continued patching Stair -2 (800x600).jpg Continued welding the tube steel at the top of the Main steel column Facing East (800x600).jpg Door frames delivery for the 1st floor Facing West (800x600).jpg Installing split wire above the cealing at the 2nd floor Facing West (800x600).jpg Main Sprinkler piping at the 1st Floor Facing North-East (800x600).jpg Metal Track (800x600).jpg Poured slab on deck at half of the 4th Floor Facing North-West (800x600).jpg Pouring concrete at half of the 4th Floor Facing North-West (800x600).jpg
Previous pageNext page Installing split wire above the cealing at the 2nd floor Facing West (800x600)
Installing split wire above the cealing at the 2nd floor Facing West (800x600)